STRUCTURAL SAFETY MANAGEMENT
To manage and oversee the structural safety and worker safety for the build and de-rig of the main stage and performance areas for the Col Gaddafi 40th Anniversary Celebrations to include crane and lifting plans and crew welfare.
Tripoli, Libya and UK
July 2009
To create a safe and successful structural build for the ceremonies main performance area. To undertake and over see worker safety which included safety and work at height together with the issues and dangers of working in temperatures that exceeded thirty degrees and full sunshine. To manage and prepare plans under CDM Regs with crane and lifting plans together with full work at height rescue plans.
"Colonel Gaddafi party to outshine the Beijing Olympics; Libya is planning a celebration on the scale of the Beijing Olympics Opening Ceremony to celebrate the 40th anniversary of the coup that brought Colonel Gaddafi to power. If anything, the superlatives will be even greater as Beijing 2008 did not boast the world's largest tent, 1,000 camels, Toureg nomads or 40 hot air balloons. Performers are being flown in from all over the planet, from dancers and fireworks specialists to a brass band from Wales."
Richard Spencer, The Daily Telegraph
All content copyright Try Anything Once Limited
No text from this website can be reproduced without prior permission from Try Anything Once Ltd - As such all text on these pages is protected by enforceable copyright.
Regarding the pictures on these pages - Try Anything Once Ltd either owns the rights to these pictures, has permission to use these pictures or has taken every step possible to contact the owner of any borrowed pictures – As such all pictures on this page are protected by enforceable copyright
Try Anything Once Limited
Registered in England and Wales Company No: 07119263
Registered Office Address: "Whiteoaks", Gravelly Lane, Stonnall, West Midlands, WS9 9HX